• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Services

    • Missions
    • Show All Missions
    • Archives
    • News Archive
    • Science Results
    • Multimedia Gallery
    • Publication Archive
    • Status Report Archive
    • Journal Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Status Report Archive

    Search Results:

      | 1 |   [Refine Search]
    2 items found  page 1 of 1
    No. 242 – End of Earth occultation season #12; start of Atmospheric Drag Experiment campaign #7

    Report for the period 18 December 2011 to 14 January 2012

    This reporting period covers four weeks of Venus Express mission operations, from 18 December 2011 to 14 January 2012. The period covers routine operations at moderate but increasing telemetry downlink data rates, the end of the twelfth Earth occultation season, and the beginning of the seventh Atmospheric Drag Experiment campaign.

    Date: 24 Jan 2012
    No. 241 – Nominal operations; solar eclipse; Earth occultation season #12

    Report for the period 20 November to 17 December 2011

    This reporting period covers four weeks of Venus Express mission operations, from 20 November to 17 December 2011. It includes routine planned operations at moderate but increasing telemetry downlink data rates, the end of solar eclipse season #19 and continuing Earth occultation season #12.

    Date: 03 Jan 2012
     
      | 1 |   [Refine Search]
    2 items found  page 1 of 1
     


    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions