Report for the period 18 December 2011 to 14 January 2012
This reporting period covers four weeks of Venus Express mission operations, from 18 December 2011 to 14 January 2012. The period covers routine operations at moderate but increasing telemetry downlink data rates, the end of the twelfth Earth occultation season, and the beginning of the seventh Atmospheric Drag Experiment campaign.
Report for the period 20 November to 17 December 2011
This reporting period covers four weeks of Venus Express mission operations, from 20 November to 17 December 2011. It includes routine planned operations at moderate but increasing telemetry downlink data rates, the end of solar eclipse season #19 and continuing Earth occultation season #12.