• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • INTEGRAL

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Mission Team
    • Orbit View
    • Spacecraft
    • Spacecraft
    • 3D Model
    • Instruments
    • Mission Operations
    • Mission Operations
    • Launch Vehicle
    • Launch Campaign
    • Orbit/Navigation
    • Science Operations
    • ISDC
    • ISOC
    • Data Archive (ESA)
    • Data Archive (ISDC)
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Launch Campaign

    The Launch

     

    INTEGRAL Launch Sequence

    12:00 CEST
    Transition to inertial pointing and slew check.
    INTEGRAL is safe and in a stable configuration

    08:35 CEST
    Both solar wings successfully deployed

    08:29 CEST
    Solar wings starting to deploy

    08:13 CEST
    Separation of INTEGRAL from upper stage

    08:02 CEST
    Aquisition of signal by Vilspa ground station in Spain

    07:01 CEST
    End of radio contact zone with launcher

    06:50 CEST
    Separation of upper stage and INTEGRAL from the third stage

    06:41 CEST
    Launch of INTEGRAL

    06:36 CEST
    Proton rocket declared ready for launch

    06:18 CEST
    Transition to internal power completed

    06:11 CEST
    INTEGRAL declared ready for launch.

    05:56 CEST
    Completion service tower rollback.
    Windspeed 31 ms-1

    05:26 CEST
    Start of roll back of service tower from the Proton rocket at Baikonur.
    All nominal.

    04:33 CEST
    Mission Control at ESOC commences voice and status checks with all ground stations.

    03:46 CEST
    INTEGRAL spacecraft powered up
    Sunrise.

    03:41 CEST
    INTEGRAL spacecraft is switched on and telemetry received.

    03:31 CEST
    Completion propellant loading of Proton launch vehicle.
    Outside temperature -5.5°C, Fairing temperature 17°C.

    00:41 CEST
    Countdown starts at ESOC; loading of propellant on the Proton launcher in Baikonur commences.

    23:00 CEST 16 October 2002
    Everything is still on track for launch.
    Weather conditions are acceptable for launch

    11.00 CEST 16 October 2002
    INTEGRAL Flight Operations Director says Integral is GO for launch.
    Launch is on schedule for 06:41 from Baikonur in Kazakhstan.

    15th October (II)

    Last Update: 09 Nov 2012

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=31644
    • Related Articles
    • The Launch
    • 15th October (II)
    • 15th October (I)
    • 14th October
    • 12th October
    • 11th October
    • 8 - 10 October
    • 30 September - 4th October
    • 22-29 September
    • 1-21 September
    • 17-30 August
    • Diary Author
    • Baikonur Cosmodrome
    • Images and Videos
    • Baikonur celebrates the anniversary of the launch of Sputnik, 4 October 2002

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions