• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • INTEGRAL

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Mission Team
    • Orbit View
    • Spacecraft
    • Spacecraft
    • 3D Model
    • Instruments
    • Mission Operations
    • Mission Operations
    • Launch Vehicle
    • Launch Campaign
    • Orbit/Navigation
    • Science Operations
    • ISDC
    • ISOC
    • Data Archive (ESA)
    • Data Archive (ISDC)
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Launch Campaign

    8 - 10 October

    10 October

    INTEGRAL ground segment declared ready

    ESOC Main Control Room

    The last INTEGRAL simulation was successfully completed at the European Space Operations Centre (ESOC) in Germany on 10 October 2002. INTEGRAL's Mission Operation Control ground segment has been tested and validated in systems validation and mission readiness tests, and altogether 34 simulations, for a total of 300 hours, have been carried out.

    Simulation tests covered the critical launch and early orbit phase, commission phase and routine phase activities as well as appropriate contingency recovery operations. The results showed that mission operations staff are fully trained and ready, and that the entire 'people/machines/procedures' system is able to execute reliably and correctly all planned INTEGRAL operations within the given time constraints.

    The INTEGRAL Mission Operation Control (MOC) ground segment consists of:

    • the MOC at ESOC with its mission operations control facilities
    • the ground stations Redu in Belgium, Goldstone (DSS16) in California USA, Vilspa 2 in Spain and Perth, Australia
    • the communication systems connecting the MOC with supporting ground stations and with the INTEGRAL Science Data Centre and the INTEGRAL Science Operation Centre
    • the operational documentation for the satellite, flight dynamics and supporting ground facilities
    • the databases for telemetry, telecomand, tracking, flight dynamics and ground facilities

    Rollout of the Space Head Unit

    The Space Head Unit (made up of the INTEGRAL satellite, separation systems, adaptors, fairing and Proton upper stage), was rolled out on 10 October at 10:15 Baikonur time to begin its short journey to the Launcher Integration Building about 500 m away. As always with a fuelled satellite and an upper stage, stringent safety precautions were implemented and the fire brigade and ambulance were present.

    The Space Head Unit on its railcar leaving building 92A-50

    The Space Head Unit inside the Launcher Integration Building

    A locomotive pulled the railcar with the Space Head Unit (SHU) into the building. Once the locomotive had exited from the other side of the building the SHU was lifted into position for mating with the first three stages of the Proton. 

    Mating of the Space Head Unit with the first three stages of the Proton launcher

    The complete mated Proton launcher, with INTEGRAL safely inside the fairing

    Once mated, ESA and Alenia engineers verified the correct electrical continuity between the upper stage and the bottom of the Proton rocket. This connection will be used later on the pad to communicate with the satellite prior to liftoff. A test of the upper stage battery was also carried and proved successful.

    8 October

    Final Space Head Unit operations

    Now that the INTEGRAL satellite is inside the fairing, the Proton launch authorities are driving the schedule of activities, according to their proven record of timely launches.

    On 5 October, final operations were carried out on the fairing. This includes mechanical operations such as filling up access holes, fixing venting ports and some electrical checks.

    Sticking on the INTEGRAL Logo

    Final operations on the fairing

    The INTEGRAL logo, brought over from ESTEC, was fixed on 7 October. The exact location of the logo generated a heated debate among the team. The logo should first fit on the fairing, be seen during transportation of the space head to the launcher and of course be visible on the launch pad, before lift off, from the observation point. After some discussion, lead ESA launcher interface engineer Barrie Henson found a suitable compromise with our Russian partners.

    Once complete, the space head unit was lifted on 8 October by 2 cranes and loaded on a railcar, for transport to the Launcher Integration Building.

    Loading of the space head unit on the railcar

    Fixing the space head unit to the railcar

    The Space Head will now leave the main spacecraft integration building (building 92A-50) where the INTEGRAL team has its offices. The team will now have to split into 3 groups. One group will follow the activities in the Launcher Integration building (building 92-1).

    Others will start preparations in the launch pad and bunker (launch complex 200), while the packing team will remain here to start moving equipment back into their boxes and into sea containers for the return trip. It will be again a busy time in Baikonur.

    Note: We have had the pleasure of welcoming Stephane Corvaja, our official ESA photographer.

    11th October
    30 September - 4th October

    Last Update: 09 Nov 2012

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=31644
    • Related Articles
    • The Launch
    • 15th October (II)
    • 15th October (I)
    • 14th October
    • 12th October
    • 11th October
    • 8 - 10 October
    • 30 September - 4th October
    • 22-29 September
    • 1-21 September
    • 17-30 August
    • Diary Author
    • Baikonur Cosmodrome
    • Images and Videos
    • Baikonur celebrates the anniversary of the launch of Sputnik, 4 October 2002

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions