• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Rosetta

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Mission Team
    • Orbit View
    • Background Science
    • 67P/C-G
    • (2867) Steins
    • (21) Lutetia
    • Asteroids
    • Map of Lutetia
    • Orbiter
    • 3D Model
    • Instruments
    • Engineering
    • Lander
    • Instruments
    • Mission Operations
    • Mission Operations
    • Launch Vehicle
    • 2nd Rosetta Launch Campaign
    • Launch Information
    • ESOC Info
    • Science Operations
    • RSOC
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Calendar of Events
    • Status Report Archive
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Ariane 5 Rolls Out

    11 Feb 2004 15:32

    Yesterday the Ariane 5 spacecraft, minus its payload, was moved from the BIL (Batiment d'Integration des Lanceurs) to BAF (Batiment d'Assemblage Final).

    Transfer began at 10:15 a.m., local time, on a bright French Guiana morning, and lasted for 30 minutes. The vehicle is shown as it leaves the Launcher Integration Building on its mobile launch table.
    Midway in the transfer process, the Ariane 5 and its launch table are framed by blue skies and French Guiana vegetation. A temporary dome covers the launcher's central core stage, providing protection for the EPS upper stage and vehicle equipment bay.
    Ariane 5 nears the completion of the transfer process as it approaches the Final Integration Building at the Spaceport. This building's height provides sufficient room for the Rosetta space probe and its protective payload fairing to be hoisted up and installed atop Ariane 5.


    Last Update: 25 Mar 2004

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=34641
    • Images and Videos
    • Ariane V158 arrives successfully at BAF
    • Roll out of Ariane V158 from the BIL
    • Ariane V158 on its way to the BAF
    • Journal
    • Archives
    • See also
    • 05 March 2004
    • 02 March 2004 - Launch
    • 01 March 2004
    • 27 February 2004 - II
    • 27 February 2004 - I
    • 26 February 2004
    • 25 February 2004
    • 23 February 2004
    • 17 February 2004
    • 13 February 2004
    • 12 February 2004
    • 11 February 2004
    • 10 February 2004
    • 05 February 2004
    • 18 December 2003
    • 26 November 2003
    • 21 November 2003
    • 07 November 2003
    • 2nd Rosetta Launch Campaign

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions