SMART-1 Launch Phase15 July 2003 - Start of Launch Campaign in KourouAfter its arrival at Cayenne airport, SMART-1 was transferred by truck to Kourou, where the spacecraft was removed from its transport container. An initial inspection was carried out to verify SMART-1's condition after transport. Journal: Launch Campaign Gets Underway
August 2003 - Simulation Runs of Flight OperationsJournal: Simulation runs at Flight Operations Centre, ESOC Darmstadt 13 August 2003 - Launch on HoldThe initial launch date of 28 August 2003, 23:04 UT, was pushed back to allow necessary verification checks on one of the two commercial satellites that were also scheduled to be launched on the same flight as SMART-1. News: SMART-1 Launch Delayed
19 August 2003 - Second Launch DelayNews: SMART-1 Launch Put Back
17 September 2003 - SMART-1 Mated with LauncherJournal: SMART-1 mated with launcher
19 September 2003 - New Launch Date ConfirmedNews: SMART-1 Launch Date set for 27 September 26 September 2003 - SMART-1 Ready for LaunchJournal: Launch Readiness Review completed
27 September 2003 - Launch of SMART-1
News: Successful launch of Ariane Flight 162
Last Update: 23 Aug 2006
|






