No. 123 - Routine Operations |
|
|
25 March 2008 Report for Period 16 March to 22 March 2008 Routine operations continued nominally as planned.
The battery discharge test has been postponed to a more favourable time (currently during the next quadrature phase in January 2009, TBC). The first draft of the battery deep discharge test has been released. Detailed procedures will be prepared and reviewed. The table below shows a chronology of the main activities in the reporting period:
At the end of the last Cebreros pass in the reporting period (DOY 082) Venus Express was orbiting Venus at 235.4 million km from the Earth. The one-way signal travel time was 785.3 seconds. Payload ActivitiesASPERA MAG PFS SPICAV VeRA VIRTIS VMC Future Milestones
|
||||||||||||||||||||||||||||||||